Skip links

Projects & Case Studies

Pavigym flooring at Soho House Amsterdam

SOHO HOUSE Amsterdam

According to Soho House Amsterdam, BigJag 90 offers:

  • Noise-Free bliss. Soho House Amsterdam succeeded in silencing the noise and eliminating the vibrations in its gym, raising the atmosphere
  • Aesthetic upgrade. A new, modern and premium look that enhanced the guest experience.
  • Cost-effective & clean. BigJag all-in- one solution saved costs, eliminated disruptive construction, and left no mess.
Pavigym flooring at On Air Clermont-Ferrand

ONAIR FITNESS Clermont-Ferrand

According to Vincent Teixera, OnAir Club Manager, Optifoam offers:

  • Reduced impact noise and vibrations, creating a more tolerable environment for both members and neighbors.
  • Easy installation, as it provides quick and effective noise reduction, enabling a fast reopening without the need for additional building work.
  • Unparalleled durability with minimal maintenance needs.
Pavigym flooring at STC Lab

STC LAB Sweden

According to STC Lab, BigJag 70 offers:

  • Whispering Serenity. STC achieved a notable feat in quelling the noise within the group X area, significantly enhancing the comfort for users training in that space and creating a more enjoyable environment for those utilizing the rest of the gym facilities.
  • Visual Enhancement. A contemporary and premium aesthetic that seamlessly blends with the overall gym ambiance, creating an attractive environment that captivates STC employees and makes it more inviting for them to engage in their workouts.
  • Budget-friendly and Clean. BigJag’s all-in-one solution not only delivered cost savings but also spared them from disruptive construction, ensuring a clean and tidy outcome.
Pavigym flooring at JD Gyms Liverpool

JD GYMS Liverpool

According to JD Gyms Liverpool, BigJag 90 offers:

  • Acoustic Isolation. JD successfully tackled noise and vibration issues in the free weights area, improving the user experience and preserving the historic building in Liverpool’s city centre. Despite the challenge of finding the right acoustic solution, JD overcame this with an innovative solution.
  • Gym Elegance. High-quality materials that effortlessly blend with the overall design and aesthetics. The new level three free weights space has created a welcoming area that encourages members to train in a safe environment, giving JD the confidence that they have protected the building.
  • Effortless and quick installation. BigJag not only has excellent impact sound absorption but is also effortlessly easy to install, within a tight refurbishment schedule, at JD Liverpool the quick installation helped other contractors to stay on programme. Efficient and straightforward, ensuring everyone meets their deadlines.
Pavigym flooring at Pfitzenmeier Karlsruhe

PFITZENMEIER Karlsruhe

According to Pfitzenmeier Manager, Extreme offers:

  • Exceptional durability, resisting impacts and equipment marks.
  • Hygienic properties for easy cleaning and maintenance.
  • Most sustainable choice, upholding durability and aesthetics.
Pavigym flooring at Prime Time Fitness

PRIME TIME FITNESS Frankfurt

According to Prime Time Fitness Manager, Pavigym Balance is:

  • Designed for shock absorption and stability, resisting equipment impacts and marks.
  • Provides superior thermal insulation and a comfortable and safe surface.
  • Offers a perfect balance of comfort and stability, protecting athletes’ joints.